Cost guides › Solar panels › South Dakota
United States
Solar panels cost in South Dakota
Most homeowners pay $19,000 – $31,700 (mid-range, typical $24,400, before sales tax), in line with the national average.
Most homeowners pay
Estimate your project
Compare materials
mid-range, typicalPrice levels in South Dakota
| Typical | Labour | Materials | |
|---|---|---|---|
| Basic | $16,900 $13,200 – $22,000 | $2,601 | $14,337 |
| Mid-range | $24,400 $19,000 – $31,700 | $3,623 | $20,730 |
| Premium | $32,400 $25,200 – $42,100 | $4,674 | $27,691 |
Why prices in South Dakota are different
Labour makes up about 15% of a mid-range solar panels job, around 40 hours of trade work. Tradespeople in South Dakota cost about 5% less than the national average (official wage data: BLS Occupational Employment and Wage Statistics), while materials are priced much the same across the country. That is why the total comes out in line with the national figure.
South Dakota ranks 37 of 51 states for this job, from most to least expensive.
By area
| Location | Basic | Mid-range | Premium |
|---|---|---|---|
| Sioux Falls, SD-MN | $16,900 | $24,400 | $32,400 |
| West South Dakota nonmetropolitan area | $17,000 | $24,400 | $32,400 |
| East South Dakota nonmetropolitan area | $16,900 | $24,300 | $32,300 |
| Rapid City, SD | $16,900 | $24,300 | $32,400 |
Next to it in the price ranking
| Solar panels cost in Arizona | $24,400 |
| Solar panels cost in Iowa | $24,400 |
| Solar panels cost in Nebraska | $24,400 |
| Solar panels cost in Utah | $24,400 |
| Solar panels cost in Kentucky | $24,300 |
| Solar panels cost in Louisiana | $24,300 |
| National average | $24,500 |
Other home projects in South Dakota
Frequently asked questions
How much does solar panels cost in South Dakota?
A mid-range job typically costs $24,400 before sales tax, with most homeowners paying between $19,000 and $31,700. A basic job is about $16,900 and a premium one about $32,400.
Is solar panels more expensive in South Dakota than the national average?
South Dakota: in line with the national average. Labour makes up about 15% of a mid-range solar panels job, around 40 hours of trade work. Tradespeople in South Dakota cost about 5% less than the national average (official wage data: BLS Occupational Employment and Wage Statistics), while materials are priced much the same across the country. That is why the total comes out in line with the national figure.
How much of the price is labour in South Dakota?
About 15% at the mid-range level, around 40 hours of work at local rates. The rest is materials, equipment and disposal, which vary much less between regions.
Where in South Dakota is it most expensive?
Sioux Falls, SD-MN is the most expensive area at about $24,400 for a mid-range job, and Rapid City, SD the least expensive at about $24,300.
← Solar panel installation cost: national prices and full guide