Cost guides › Heat pump hot water › Northern Territory

Australia

Heat pump hot water cost in Northern Territory

Most homeowners pay $3,500 – $5,850 (mid-range, typical $4,500, including GST), in line with the national average.

Most homeowners pay

$3,500 – $5,850Northern Territory · 270 L · incl. GST
Typical: $4,500
Labour $720Materials $3,381Work hours: 7

Estimate your project

L
Local wage data

Price levels in Northern Territory

TypicalLabourMaterials
Basic$3,650
$2,850 – $4,750
$720$2,592
Mid-range$4,500
$3,500 – $5,850
$720$3,381
Premium$6,050
$4,700 – $7,850
$720$4,761

Why prices in Northern Territory are different

Labour makes up about 18% of a mid-range heat pump hot water job, around 7 hours of trade work. Tradespeople in Northern Territory cost about 2% more than the national average (official wage data: ABS Employee Earnings and Hours, Australia), while materials are priced much the same across the country. That is why the total comes out in line with the national figure.

Northern Territory ranks 4 of 8 states and territories for this job, from most to least expensive.

Next to it in the price ranking

Other home projects in Northern Territory

Frequently asked questions

How much does heat pump hot water cost in Northern Territory?

A mid-range job typically costs $4,500 including GST, with most homeowners paying between $3,500 and $5,850. A basic job is about $3,650 and a premium one about $6,050.

Is heat pump hot water more expensive in Northern Territory than the national average?

Northern Territory: in line with the national average. Labour makes up about 18% of a mid-range heat pump hot water job, around 7 hours of trade work. Tradespeople in Northern Territory cost about 2% more than the national average (official wage data: ABS Employee Earnings and Hours, Australia), while materials are priced much the same across the country. That is why the total comes out in line with the national figure.

How much of the price is labour in Northern Territory?

About 18% at the mid-range level, around 7 hours of work at local rates. The rest is materials, equipment and disposal, which vary much less between regions.

← Heat pump hot water system cost: national prices and full guide