Cost guides › Attic conversion › New South Wales

Australia

Attic conversion cost in New South Wales

Most homeowners pay $74,700 – $124,500 (mid-range, typical $95,800, including GST), 1% above the national average.

Most homeowners pay

$74,700 – $124,500New South Wales · 30 m² · incl. GST
Typical: $95,800
Labour $50,816Materials $36,262Work hours: 543.5

Estimate your project

m²
Local wage data

Price levels in New South Wales

TypicalLabourMaterials
Basic$85,000
$66,300 – $110,500
$45,140$32,142
Mid-range$95,800
$74,700 – $124,500
$50,816$36,262
Premium$111,200
$86,700 – $144,500
$57,523$43,530

Why prices in New South Wales are different

Labour makes up about 58% of a mid-range attic conversion job, around 544 hours of trade work. Tradespeople in New South Wales cost about 1% more than the national average (official wage data: ABS Employee Earnings and Hours, Australia), while materials are priced much the same across the country. That is why the total comes out 1% above the national figure.

New South Wales ranks 4 of 8 states and territories for this job, from most to least expensive.

Next to it in the price ranking

Other home projects in New South Wales

Frequently asked questions

How much does attic conversion cost in New South Wales?

A mid-range job typically costs $95,800 including GST, with most homeowners paying between $74,700 and $124,500. A basic job is about $85,000 and a premium one about $111,200.

Is attic conversion more expensive in New South Wales than the national average?

New South Wales: 1% above the national average. Labour makes up about 58% of a mid-range attic conversion job, around 544 hours of trade work. Tradespeople in New South Wales cost about 1% more than the national average (official wage data: ABS Employee Earnings and Hours, Australia), while materials are priced much the same across the country. That is why the total comes out 1% above the national figure.

How much of the price is labour in New South Wales?

About 58% at the mid-range level, around 544 hours of work at local rates. The rest is materials, equipment and disposal, which vary much less between regions.

← Attic conversion cost: a habitable room in the roof: national prices and full guide