Cost guides › Solar panels › Saskatchewan
Canada
Solar panels cost in Saskatchewan
Most homeowners pay $20,000 – $33,300 (mid-range, typical $25,600, before GST/HST), in line with the national average.
Most homeowners pay
Estimate your project
Price levels in Saskatchewan
| Typical | Labour | Materials | |
|---|---|---|---|
| Basic | $18,100 $14,200 – $23,600 | $2,860 | $15,285 |
| Mid-range | $25,600 $20,000 – $33,300 | $2,894 | $22,725 |
| Premium | $31,700 $24,700 – $41,100 | $2,927 | $28,727 |
Why prices in Saskatchewan are different
Labour makes up about 11% of a mid-range solar panels job, around 25 hours of trade work. Tradespeople in Saskatchewan cost about 6% more than the national average (official wage data: Job Bank wages (Employment and Social Development Canada)), while materials are priced much the same across the country. That is why the total comes out in line with the national figure.
Saskatchewan ranks 3 of 9 provinces for this job, from most to least expensive.
By area
| Location | Basic | Mid-range | Premium |
|---|---|---|---|
| Swift Current--Moose Jaw | $18,300 | $25,800 | $31,800 |
| Regina--Moose Mountain | $18,100 | $25,600 | $31,600 |
| Saskatoon--Biggar | $18,100 | $25,600 | $31,700 |
| Yorkton--Melville | $18,100 | $25,600 | $31,700 |
| Northern | $18,000 | $25,400 | $31,500 |
| Prince Albert | $18,000 | $25,400 | $31,500 |
Next to it in the price ranking
| Solar panels cost in Quebec | $26,000 |
| Solar panels cost in Alberta | $25,700 |
| Solar panels cost in British Columbia | $25,400 |
| Solar panels cost in Manitoba | $25,400 |
| Solar panels cost in Ontario | $25,400 |
| National average | $25,500 |
Other home projects in Saskatchewan
Frequently asked questions
How much does solar panels cost in Saskatchewan?
A mid-range job typically costs $25,600 before GST/HST, with most homeowners paying between $20,000 and $33,300. A basic job is about $18,100 and a premium one about $31,700.
Is solar panels more expensive in Saskatchewan than the national average?
Saskatchewan: in line with the national average. Labour makes up about 11% of a mid-range solar panels job, around 25 hours of trade work. Tradespeople in Saskatchewan cost about 6% more than the national average (official wage data: Job Bank wages (Employment and Social Development Canada)), while materials are priced much the same across the country. That is why the total comes out in line with the national figure.
How much of the price is labour in Saskatchewan?
About 11% at the mid-range level, around 25 hours of work at local rates. The rest is materials, equipment and disposal, which vary much less between regions.
Where in Saskatchewan is it most expensive?
Swift Current--Moose Jaw is the most expensive area at about $25,800 for a mid-range job, and Prince Albert the least expensive at about $25,400.
← Solar panel installation cost: national prices and full guide