A 6 kWp rooftop solar system with a hybrid inverter and a 4.8 kWh battery typically costs $25,500 installed, with most quotes between $19,900 and $33,100 before GST/HST. The same array without a battery comes in around $18,000, and a larger 9.6 kWh battery on a heavier-duty inverter runs about $31,500.

Most homeowners pay

$19,900 – $33,100National average · 6 kWp · before GST/HST
Typical: $25,500
Labour $2,738Materials $22,725Work hours: 24.8

Estimate your project

kWp
Regional estimate

Cost by region

Newfoundland and Labrador: $25,100Prince Edward IslandNova Scotia: $25,100New Brunswick: $24,900Québec: $26,000Ontario: $25,400Manitoba: $25,400Saskatchewan: $25,600Alberta: $25,700British Columbia: $25,400YukonNorthwest TerritoriesNunavut
−+
LocationBasicMid-rangePremium
Quebec$18,500$26,000$32,000
Alberta$18,200$25,700$31,700
Saskatchewan$18,100$25,600$31,700
British Columbia$17,900$25,400$31,400
Manitoba$18,000$25,400$31,500
Ontario$17,900$25,400$31,400
Newfoundland and Labrador$17,700$25,100$31,200
Nova Scotia$17,700$25,100$31,200
New Brunswick$17,500$24,900$30,900

What's included

Mid-range

What affects the cost

Battery or no battery

The battery is one of the biggest single line items. Without it the system costs around $18,000; with it you store daytime solar for the evening and can keep essential loads running in an outage, depending on how the system is wired.

System size

Larger systems cost more in total but less per watt, because design, permits, inverter and labour are partly fixed. The right size depends on your annual electricity use and how your utility credits power you send to the grid.

Winter production and snow

Canadian systems produce most of their energy from spring to fall; short days and snow cover cut winter output. Size the system on a full year of bills, and expect panels to shed snow on their own rather than being cleared by hand.

Roof type and condition

The estimate assumes a sound pitched roof facing roughly south. Metal and other roof types need different attachments than asphalt shingles, and a roof that needs replacing within a few years should be redone before panels go on.

Electrical panel

Older 100 A panels often can't take a solar breaker without a panel upgrade. A main-panel replacement is not included.

Permits and grid connection

Building and electrical permits, utility connection fees and any structural review are not in this estimate. They vary by municipality and utility.

How to save

  • Get at least three itemized quotes and compare them per watt, with and without the battery.
  • Size the system to your actual usage from the last 12 months of bills, not the largest array the roof can hold.
  • Fix or replace an ageing roof first, so panels don't have to be removed and reinstalled later.
  • In Ontario, compare the rebate against net metering before you sign, because the solar rebate can't be combined with it.

Grants, tax and rules

Canada Greener Homes is closed

The Canada Greener Homes Grant and Loan, which covered solar, are closed; the deadline for grant documents was 31 December 2025. Quotes that still subtract that grant are out of date.

Ontario Home Renovation Savings

As of September 2026 the Ontario program pays $1,000 per kW of solar, up to $5,000 and at most 50% of the cost, but not together with net metering. A battery installed with new solar earns $300 per kWh, up to $5,000. Pre-approval and a participating contractor are required.

Licensed trades, permits and GST/HST

Solar involves electrical work and roof attachments, which need a licensed electrician and usually a permit. GST/HST applies; our figures are before GST/HST (13% HST in Ontario, 5% GST in Alberta).

Frequently asked questions

How much does a 6 kW solar system cost in Canada?

With a 4.8 kWh battery, a 6 kWp system costs about $25,500 installed, before GST/HST. Without the battery, expect around $18,000. Permits and utility connection fees come on top.

Is there a federal grant for solar panels?

Not any more: the Canada Greener Homes Grant is closed, and its document deadline was 31 December 2025. Provincial programs such as Ontario Home Renovation Savings may still apply.

Does solar make sense with Canadian winters?

Panels work in cold weather, and cold actually helps their efficiency, but short days and snow cut output in December and January. The system earns most of its value over spring, summer and fall, so judge it on a full year.

Do I need a battery with solar panels?

No, the panels work without one. A battery makes sense if your utility pays little for exported power, charges more in the evening, or if you want backup during outages.

How many panels is a 6 kW system?

With 450 W panels it is about 13–14 panels, needing roughly 27 m² of unshaded roof. Lower-wattage panels mean more of them.

How long does a solar installation take?

The physical installation usually takes one to three days. Permits, utility approval and final inspection often take several weeks before the system can be switched on.

How this estimate is calculated

Work hours: 24.8 · Labour: $2,738 · Materials: $22,725

Sources: Job Bank wages (Employment and Social Development Canada); Regione Toscana, Prezzario dei Lavori 2026 (CC BY 4.0); ECB exchange rates.