Cost guides › Ductless mini-split › Ontario
Canada
Ductless mini-split cost in Ontario
Most homeowners pay $7,800 – $13,000 (mid-range, typical $10,000, before GST/HST), in line with the national average.
Most homeowners pay
Estimate your project
Price levels in Ontario
| Typical | Labour | Materials | |
|---|---|---|---|
| Basic | $5,150 $4,000 – $6,700 | $796 | $4,343 |
| Mid-range | $10,000 $7,800 – $13,000 | $2,606 | $7,380 |
| Premium | $19,300 $15,100 – $25,100 | $3,787 | $15,552 |
Why prices in Ontario are different
Labour makes up about 26% of a mid-range ductless mini-split job, around 33 hours of trade work. Tradespeople in Ontario cost about 1% less than the national average (official wage data: Job Bank wages (Employment and Social Development Canada)), while materials are priced much the same across the country. That is why the total comes out in line with the national figure.
Ontario ranks 5 of 9 provinces for this job, from most to least expensive.
By area
| Location | Basic | Mid-range | Premium |
|---|---|---|---|
| Ottawa | $5,200 | $10,200 | $19,600 |
| Kitchener--Waterloo--Barrie | $5,200 | $10,100 | $19,500 |
| Muskoka--Kawarthas | $5,150 | $10,000 | $19,400 |
| Toronto | $5,150 | $10,000 | $19,400 |
| Hamilton--Niagara Peninsula | $5,150 | $9,950 | $19,300 |
| Northwest | $5,150 | $9,950 | $19,300 |
| Northeast | $5,100 | $9,850 | $19,100 |
| Stratford--Bruce Peninsula | $5,100 | $9,850 | $19,200 |
| Windsor--Sarnia | $5,100 | $9,850 | $19,000 |
| London | $5,050 | $9,750 | $19,100 |
| Kingston--Pembroke | $5,050 | $9,650 | $18,900 |
Next to it in the price ranking
Other home projects in Ontario
Frequently asked questions
How much does ductless mini-split cost in Ontario?
A mid-range job typically costs $10,000 before GST/HST, with most homeowners paying between $7,800 and $13,000. A basic job is about $5,150 and a premium one about $19,300.
Is ductless mini-split more expensive in Ontario than the national average?
Ontario: in line with the national average. Labour makes up about 26% of a mid-range ductless mini-split job, around 33 hours of trade work. Tradespeople in Ontario cost about 1% less than the national average (official wage data: Job Bank wages (Employment and Social Development Canada)), while materials are priced much the same across the country. That is why the total comes out in line with the national figure.
How much of the price is labour in Ontario?
About 26% at the mid-range level, around 33 hours of work at local rates. The rest is materials, equipment and disposal, which vary much less between regions.
Where in Ontario is it most expensive?
Ottawa is the most expensive area at about $10,200 for a mid-range job, and Kingston--Pembroke the least expensive at about $9,650.
← Mini-split installation cost: national prices and full guide